Advanced was called upon to provide lifting solutions for a large power systems manufacturer. Working as a team, we were able to solve their needs while meeting difficult constraints such as limited floor space and a demanding lead time. The gantry crane solution was key in providing functional lifting while eliminating the need for additional concrete footings in their facility.
10 Ton Motorized Gantry Cranes for Power Systems Producer