Advanced was tasked to provide a material handling solution for multiple work cells in the manufacturing of composite pressure vessels. The design took shape in the form of (3) individual enclosed track monorails utilizing a shared infrastructure. The completed system consisted of over 300 linear feet of track with various curved sections and a transfer area for diverting vessels in and out of the system. Additionally, multiple electric chain hoists were furnished to provide lifting with power supplied via internally wired electrification. This innovative solution optimized production throughput while maximizing available floor space.
Curved Track Monorail Solution for Multiple Work Cells